Massdot inspections

Complex & Statewide (9 Contracts)

Statewide – Massachusetts

For 16 years, Green has performed inspections of complex bridges for MassDOT as part of five separate Complex Bridge inspection contracts. Under these contracts, we have provided full inspection teams responsible for the completion of the structural inspections and all reports associated with each structure.

We have performed Routine, In-Depth, Fracture Critical, Special Member, Other, and Freeze Thaw inspections and prepared their associative reports, including the National Bridge Element (NBE) reports. We perform all work in accordance with the MassDOT Bridge Inspection manual, NBIS, and latest Bridge Inspection Reference Manual (BIRM).

Our assignments have included:

  • Merrimack River Crossings such as the Wood Street extension or Rourke memorial Bridge and the Bridge Street Bridges in Lowell, the Duck Bridge in Lawrence, and the new Whittier Bridge in Amesbury carrying Route I-95.
  • Taunton River crossings such as the Berkley-Dighton temporary bridge carrying Elm Street, and the old Brightman Street and Braga Bridges in Fall River